Week 1
request, intake and scheduling the survey

Thuisaccu installatie
How is a home battery installed? From survey and meter cupboard work to mounting, connection and handover. So you know what to expect, how long each phase takes and what you can arrange.
Book a free consultation
Enter your details. We will call you within 24 hours.
Step 1 of 5
Where will the battery be installed?

Home battery installation follows fixed phases. First a survey checks whether your meter cupboard, inverter and chosen location are suitable. The cupboard may then be upgraded, often on a separate visit. Then comes installation day: mounting, wiring, connection, testing and handover. Mounting and electrical connection usually happen in one day.
Here you read how the process runs, from survey to handover. Useful if you want to know what to expect upfront.
No two homes are the same. A terraced house with a full hall cupboard needs different preparation than a detached home with a garage. The steps stay the same, but timing and workload per phase can differ. After the survey you know where you stand.
Not everything happens on one day. This sequence is typical for a standard home with solar panels. Allow several weeks from first contact to a working battery, especially if the meter cupboard must be upgraded first.
request, intake and scheduling the survey
45–90 minutes, measurements and photos (no mounting yet)
half day, often 1–2 weeks before installation
mounting, cabling, connection, testing and handover (4–8 hours)
operating instructions and documentation
system may behave differently while software settles in (normal)

The installer inspects your meter cupboard, available space and connection to solar panels or inverter. Distances, ventilation and accessibility are measured; free circuits and main switch capacity are checked. The intended battery location is assessed: floor or wall, temperature and clearance.
Installer
Measuring, photos for the file, circuit planning, main switch assessment and checking whether the cupboard suits a home battery.
You
Ensure access to meter cupboard and battery location. Have inverter details (brand/model on sticker) or P1 information ready. Allow 45–90 minutes. No drilling or mounting during the survey.


Book a free consultation. We walk through your situation and the installation process together.